Northeast Michigan Oral History and Historic Photograph Archive

Results

We found
5
matching items
  • Remove search term Year: 1959
List Thumb list Columns Gallery
  • Survey of City of Alpena Waterfront Property (1959)
        A survey conducted by the R.S. Scott Engineering Co., Inc of waterfront property in the City of Alpena from 1959. Map details small boat harbor and view of the city from Hitchcock St to Thunder Bay R
      A survey conducted by the R.S. Scott Engineering Co., Inc of waterfront …
  • Huey Campbell
        Huey Campbell at the old dumping grounds in Alpena in 1959.
      Huey Campbell at the old dumping grounds in Alpena in 1959.
  • St. Augustine Catholic Church, Hillman
        Construction of the St. Augustine Catholic Church in Hillman began in 1957. Its dedication or "solemn blessing" took place on July 3, 1960. The church is located on Veterans Memorial Highway.
      Construction of the St. Augustine Catholic Church in Hillman began in 1957. …
  • St. Augustine Catholic Church, Hillman
        Construction of the St. Augustine Catholic Church in Hillman began in 1957. Its dedication or "solemn blessing" took place on July 3, 1960. The church is located on Veterans Memorial Highway.
      Construction of the St. Augustine Catholic Church in Hillman began in 1957. …
  • The Timber Cruiser Vol.2, No.3
        The Timber Cruiser published by the Journalism class of Alpena Community College November 1959 volume 2, number 3. Main headline Farm Bureau and AFL-CIO Representatives at ACC
      The Timber Cruiser published by the Journalism class of Alpena Community College …
Powered by / Alimenté par VITA Toolkit
Privacy Policy